Kitchen Remodeling in San Francisco, CA.

Full kitchen remodels across San Francisco: layout reconfiguration, cabinetry, countertops, plumbing, and electrical handled under one contract. Finished to the standard SF buyers and appraisers expect.

Request walk-through Call (415) 218-9270
Licensed CSLB Licensed & Insured
Serving San Francisco & Peninsula
Reviews 5.0 Stars on Google
On every job Michael Behan, On-site
Our approach

Kitchens that work harder, finished cleaner.

A kitchen remodel touches more trades than almost any other room: cabinetry, electrical, plumbing, gas, tile, countertops, appliances. When those trades don't coordinate, the project drags. When they do, the kitchen comes in on schedule and looks the way the renderings promised.

We sequence the trades, handle the permits, and finish the work to the standard San Francisco buyers expect when the home comes up for sale or appraisal.

What's included

The work, spelled out.

Every kitchen remodeling project we take on in San Francisco includes the following. Anything outside this scope is called out in the written bid before work starts.

01

Design & layout

Work with your designer or ours to reconfigure the kitchen layout where it makes sense, walls moved, windows added, islands sized correctly.

02

Permits & inspections

SF DBI permits for any plumbing, gas, or electrical work that requires them. All inspections passed.

03

Demolition & structural

Clean demolition, structural reinforcement where layout changes require it, and prep for the new build-out.

04

Cabinetry & countertops

Cabinet installation and countertop fabrication, with templating scheduled at the right point so the whole sequence lines up.

05

Plumbing, gas & electrical

All trade work coordinated and inspected, not bolted on after the cabinets go in.

06

Finish & punch list

Tile, paint, trim, hardware, appliance install, and a thorough punch list before you move back in.

Modern kitchen remodel with dark cabinetry, quartz counters, custom wood slat ceiling, and pendant lighting
What this looks like

What a kitchen remodel typically involves.

Layout reconfiguration is the biggest variable. Keeping plumbing and gas runs in place is cheaper, moving them is more flexible. Cabinetry, countertops, tile, lighting, and finish work follow. The trades have to be sequenced properly or the project drags.

Discuss your project
Get started

Ready to talk about your kitchen remodeling project?

Send a few details and Michael will reach out to schedule an on-site walk-through. Or call us directly at (415) 218-9270.

Tally form placeholder
Inquiry form embed
Replace this div with the Tally embed code once the form is built.